Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Atrium hot smoke tests might be required to be carried out in evaluating the performance of mechanical smoke exhaust systems when necessary, if the design does not comply with the prescriptive code. However, the criteria listed in the testing procedure might not be satisfied at the same time. This point will be discussed in this paper.
Atrium hot smoke tests might be required to be carried out in evaluating the performance of mechanical smoke exhaust systems when necessary, if the design does not comply with the prescriptive code. However, the criteria listed in the testing procedure might not be satisfied at the same time. This point will be discussed in this paper.
On Carrying Out Atrium Hot Smoke Tests
Chow, W. K. (Autor:in)
Architectural Science Review ; 48 ; 105-107
01.03.2005
3 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
On Carrying Out Atrium Hot Smoke Tests
British Library Online Contents | 2005
|On Carrying Out Atrium Hot Smoke Tests
Online Contents | 2005
|Field Tests on Atrium Smoke Control Systems
British Library Online Contents | 1995
|Field Tests on Atrium Smoke Control Systems
British Library Conference Proceedings | 1995
|Atrium Hot Smoke Tests in a Big Shopping Complex
British Library Online Contents | 2006
|