A simulation optimisation tool for planning of low-income housing projects
Construction of low-income housing projects is a recurring process and is associated with uncertainties that arise from the unavailability of resources. This paper presents a case study that discusses how computer simulation and optimisation are used to aid government agencies and/or contractors in planning of such projects. It illustrates the optimisation of project objectives, taking into consideration the interaction amongst involved resources. As such, total duration and the associated total costs, including direct and indirect costs, can be estimated and optimised. One Youth Habitation project that is executed in 6th of October City in Egypt is analysed in a step-by-step procedure to demonstrate the capability of proposed computer simulation and optimisation prototype (named LIHouse{_}Sim) in the modelling construction of low-income housing projects using bearing block walls with hollow core technique. The presented tool proves its practicality to contractors in estimating the time and costs of the recurring process of low-income housing construction, considering complex interdependencies between construction resources and the uncertainties associated with construction activities. The LIHouse{_}Sim prototype is used to perform a wide analysis for the alternative of the effective optimisation criteria in the bearing block walls/hollow core technique and for the genetic algorithm optimisation approach elements.
A simulation optimisation tool for planning of low-income housing projects
Construction of low-income housing projects is a recurring process and is associated with uncertainties that arise from the unavailability of resources. This paper presents a case study that discusses how computer simulation and optimisation are used to aid government agencies and/or contractors in planning of such projects. It illustrates the optimisation of project objectives, taking into consideration the interaction amongst involved resources. As such, total duration and the associated total costs, including direct and indirect costs, can be estimated and optimised. One Youth Habitation project that is executed in 6th of October City in Egypt is analysed in a step-by-step procedure to demonstrate the capability of proposed computer simulation and optimisation prototype (named LIHouse{_}Sim) in the modelling construction of low-income housing projects using bearing block walls with hollow core technique. The presented tool proves its practicality to contractors in estimating the time and costs of the recurring process of low-income housing construction, considering complex interdependencies between construction resources and the uncertainties associated with construction activities. The LIHouse{_}Sim prototype is used to perform a wide analysis for the alternative of the effective optimisation criteria in the bearing block walls/hollow core technique and for the genetic algorithm optimisation approach elements.
A simulation optimisation tool for planning of low-income housing projects
Marzouk, Mohamed (Autor:in) / Omar, Osama (Autor:in) / Hamid, Manal Abdel (Autor:in) / El-Said, Moheeb (Autor:in)
Civil Engineering and Environmental Systems ; 31 ; 51-63
02.01.2014
13 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
A simulation optimisation tool for planning of low-income housing projects
British Library Online Contents | 2014
|A simulation optimisation tool for planning of low-income housing projects
Online Contents | 2014
|Planning of Low-income Housing Projects Using Computer Simulation
British Library Conference Proceedings | 2009
|Framework for Sustainable Low-Income Housing Projects in Egypt
British Library Conference Proceedings | 2014
|