Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wuhu Second Bridge: Development of Stayed Cable Anchorage System and Application of Structural Innovations
Based on the design and construction of the second Yangtze River bridge in Wuhu (hereinafter referred to as Wuhu Second Bridge), this article introduces the structural system of a full-floating cable-stayed bridge with four cable planes, a single-column tower and separated steel box girders. A series of innovative structural measures are taken to improve the safety and economy of the bridge, such as the looping stayed cable anchorage system, the diagonal damping constraint system, and the externally prestressed segmentally assembled box girders used in the approach bridge. In addition, finite element analysis software is used to study and analyse the mechanical characteristics of the bridge. Also, the reliability of the structural anchorage system and damping constraint system is verified. Finally, the construction technology adopted for Wuhu Second Bridge is briefly described.
Wuhu Second Bridge: Development of Stayed Cable Anchorage System and Application of Structural Innovations
Based on the design and construction of the second Yangtze River bridge in Wuhu (hereinafter referred to as Wuhu Second Bridge), this article introduces the structural system of a full-floating cable-stayed bridge with four cable planes, a single-column tower and separated steel box girders. A series of innovative structural measures are taken to improve the safety and economy of the bridge, such as the looping stayed cable anchorage system, the diagonal damping constraint system, and the externally prestressed segmentally assembled box girders used in the approach bridge. In addition, finite element analysis software is used to study and analyse the mechanical characteristics of the bridge. Also, the reliability of the structural anchorage system and damping constraint system is verified. Finally, the construction technology adopted for Wuhu Second Bridge is briefly described.
Wuhu Second Bridge: Development of Stayed Cable Anchorage System and Application of Structural Innovations
Hu, KeProfessorate Senior Eng. (Autor:in) / Wang, ShengbinProfessorate Senior Eng. (Autor:in) / Yang, DahaiProfessorate Senior Eng. (Autor:in) / Liu, WanyueEng. (Autor:in)
Structural Engineering International ; 32 ; 159-162
03.04.2022
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Wuhu Double Deck Cable-Stayed Bridge
British Library Online Contents | 2004
|Recent Structures and Bridges in China - Wuhu Double Deck Cable-Stayed Bridge
Online Contents | 2004
|The Second Wuhu Yangtze River Bridge: A Cable-Stayed Bridge with a U-Shape Anchoring System
Taylor & Francis Verlag | 2023
|Fatigue of Cable Anchorage of Large Cable Stayed Bridge
British Library Online Contents | 1995
|Structural behavior of cable anchorage zones in prestressed concrete cable-stayed bridge
Online Contents | 2002
|