Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Impediments to the bus rapid transit implementation in developing countries – a typical evidence from Hanoi
Creation of an effective bus rapid transit (BRT) system has never been an easy task, especially for the first case in a developing country, since a BRT project requires a considerable investment with participation from most walks of life. Hanoi, the capital of Vietnam, has omitted to overcome impediments in the maiden BRT establishment. The Hanoi BRT performs poorly with ridership at only 13,500 passengers per day. In this paper, it is scrutinized based on a series of barriers that are findings in previous works and in the shape of a theoretical framework with seven main categories, namely: (1) institutional and legislative context, (2) political leadership and commitment, (3) physical design and operation, (4) management of competing modes, (5) adequate funding, (6) public participation and (7) image promotion. Results emphasize that the difference in views of the funder and the local authorities on the BRT development is the chief barrier. Enforcement of the BRT lanes from motorcycles is demanding, which is distinct from cities previously creating BRT. The findings from the Hanoi BRT are not unique. Lessons drawn from its failure could be widely informative for the BRT establishment in a number of cities with similar contexts.
Impediments to the bus rapid transit implementation in developing countries – a typical evidence from Hanoi
Creation of an effective bus rapid transit (BRT) system has never been an easy task, especially for the first case in a developing country, since a BRT project requires a considerable investment with participation from most walks of life. Hanoi, the capital of Vietnam, has omitted to overcome impediments in the maiden BRT establishment. The Hanoi BRT performs poorly with ridership at only 13,500 passengers per day. In this paper, it is scrutinized based on a series of barriers that are findings in previous works and in the shape of a theoretical framework with seven main categories, namely: (1) institutional and legislative context, (2) political leadership and commitment, (3) physical design and operation, (4) management of competing modes, (5) adequate funding, (6) public participation and (7) image promotion. Results emphasize that the difference in views of the funder and the local authorities on the BRT development is the chief barrier. Enforcement of the BRT lanes from motorcycles is demanding, which is distinct from cities previously creating BRT. The findings from the Hanoi BRT are not unique. Lessons drawn from its failure could be widely informative for the BRT establishment in a number of cities with similar contexts.
Impediments to the bus rapid transit implementation in developing countries – a typical evidence from Hanoi
Nguyen, Minh Hieu (Autor:in) / Ha, Thanh Tung (Autor:in) / Tu, Sy Sua (Autor:in) / Nguyen, Thanh Chuong (Autor:in)
International Journal of Urban Sciences ; 23 ; 464-483
02.10.2019
20 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Impediments to improved drainage in developing countries
British Library Conference Proceedings | 1998
|British Library Online Contents | 1996
|Land subsidence prediction for a new urban mass rapid transit line in Hanoi
DOAJ | 2020
|Transit-Oriented Development for Hanoi Sustainable Urban Development
Springer Verlag | 2021
|State Impediments to Transit-Centered Planning in Milwaukee, Wisconsin, 19161928
Online Contents | 2014
|