Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Evaluation of organizational procurement performance for public construction projects: systematic review
Construction is an essential contributor for both developed and developing economies. Corruption, schedule delays, cost overruns, and erratic project performance are common few problems that face the conventional procurement process of any organization. This research focused on the weakness of current procurement practices in public construction projects in Iraq, as stated by the World Bank and Organization for Economic Cooperation and Development (OECD) reports. The methodology of this study was to collect data by conducting a thorough systematic search of existing literature. The authors used QDA Miner 4 software for coding and thematic categorization. The study found 42 variables from previous studies, and the authors distributed these variables into 12 thematic divisions representing the organization's key performance indicators (KPIs). The authors conclude that these indicators are important to introduce many frameworks for the integration of procurement process in developing countries. For future studies, there is a possibility to introduce an integrated construction and design framework to enhance organizational performance and the procurement process.
Evaluation of organizational procurement performance for public construction projects: systematic review
Construction is an essential contributor for both developed and developing economies. Corruption, schedule delays, cost overruns, and erratic project performance are common few problems that face the conventional procurement process of any organization. This research focused on the weakness of current procurement practices in public construction projects in Iraq, as stated by the World Bank and Organization for Economic Cooperation and Development (OECD) reports. The methodology of this study was to collect data by conducting a thorough systematic search of existing literature. The authors used QDA Miner 4 software for coding and thematic categorization. The study found 42 variables from previous studies, and the authors distributed these variables into 12 thematic divisions representing the organization's key performance indicators (KPIs). The authors conclude that these indicators are important to introduce many frameworks for the integration of procurement process in developing countries. For future studies, there is a possibility to introduce an integrated construction and design framework to enhance organizational performance and the procurement process.
Evaluation of organizational procurement performance for public construction projects: systematic review
Alsamarraie, Mundher M. (Autor:in) / Ghazali, Farid (Autor:in)
International Journal of Construction Management ; 23 ; 2499-2508
26.10.2023
10 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Procurement innovation for public construction projects
Emerald Group Publishing | 2013
|Evaluation of the Public Procurement Principles Implementation in Surabaya Construction Projects
Springer Verlag | 2022
|Procurement Routes in Public Building and Construction Projects
Online Contents | 2006
|Procurement Routes in Public Building and Construction Projects
British Library Online Contents | 2006
|Maturity of procurement units for public construction projects in Indonesia
Taylor & Francis Verlag | 2023
|