Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Development plan of the Western Tigris basin in Turkey
In the western Tigris basin, Turkey is developing a £4 billion project to irrigate 0.6 million hectares, to generate 8 billion KWh a-1 electricity with 2,200 MW installed capacity. The plan encompasses the construction of over one dozen large dams and half a dozen large hydroelectric plants. The pumping requirements for irrigation will be in the order of 1.6 billion KWh a-1 with a total pump capacity of 780 MW.
Development plan of the Western Tigris basin in Turkey
In the western Tigris basin, Turkey is developing a £4 billion project to irrigate 0.6 million hectares, to generate 8 billion KWh a-1 electricity with 2,200 MW installed capacity. The plan encompasses the construction of over one dozen large dams and half a dozen large hydroelectric plants. The pumping requirements for irrigation will be in the order of 1.6 billion KWh a-1 with a total pump capacity of 780 MW.
Development plan of the Western Tigris basin in Turkey
Ozis, Unal (Autor:in)
International Journal of Water Resources Development ; 1 ; 343-352
01.12.1983
10 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Development and management of the Euphrates-Tigris basin
Online Contents | 2004
|A 40-Year Analysis of the Hydrological Drought Index for the Tigris Basin, Turkey
DOAJ | 2019
|Turkey's Hydropolitics of the Euphrates-Tigris Basin
Online Contents | 1997
|Prospects for Cooperation in the Euphrates-Tigris Basin
British Library Conference Proceedings | 1996
|Water Balance Study for the Tigris-Euphrates River Basin
Online Contents | 2011
|