Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong
Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.
Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong
Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.
Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong
Li, Heng (Autor:in) / Guo, H. L. (Autor:in) / Skitmore, Martin (Autor:in) / Huang, Ting (Autor:in) / Chan, K. Y. N. (Autor:in) / Chan, Greg (Autor:in)
Construction Management and Economics ; 29 ; 233-245
01.03.2011
13 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong
Online Contents | 2011
|Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong
British Library Online Contents | 2011
|Construction safety management in Hong Kong
British Library Conference Proceedings | 1996
|Design-Ideen von Ikea - Ikea a Milano
Online Contents | 1995