Linking procurement systems to project priorities
The main objective of this work is to assess the impacts of various procurement variables on project performance, in comparison to the impacts of non-procurement related variables, such as project conditions and team characteristics. Since the impacts of specific procurement variables, such as contract type, have been investigated before, it was decided to first develop a comprehensive framework of procurement options. This framework is based on a holistic overview of procurement systems that included, for example, sub-systems of work packaging, and type of contract. A model was next developed to link the procurement system variables to project outcomes. Additional variables such as the characteristics of the project and the project participants were incorporated into this model as 'intervening' variables. A survey in Hong Kong tested the relative strengths of such procurement sub-systems and intervening variables, in terms of their influences on project outcomes. The interim results are described in this paper. This includes observations that cost and time overruns were not significantly influenced by the chosen intervening variables. Such observations led to the identification of particular needs to further probe the influences of team performance levels, as well as of procurement sub-systems. This evaluation of the other relationships in this proposed model will assist clients and their advisers to design more appropriate procurement systems, that should be geared to their particular project priorities. L'objectif principal de ce travail est d'evaluer les incidences de diverses variables d'approvisionnement sur l'execution d'un projet, par rapport aux incidences de variables qui ne sont pas liees aux approvisionnements, comme les conditions du projet et les caracteristiques de l'equipe. Les incidences des variables propres a un approvisionnement, comme le type de contrat, ayant deja ete examinees, on a decide de constituer tout d'abord un cadre complet des options d'approvisionnement. Ce cadre repose sur une vue generale holistique des systemes d'approvisionnement qui comprenaient, par exemple, des sous-systemes de lots de travail et la type de contrat. On a ensuite realise un modele pour lier les variables du systeme d'approvisionnement aux resultats du projet. D'autres variables comme les caracteristiques du projet et les participants ont ete integrees dans le modele comme variables 'd'intervention'. Dans le cadre d'une etude realisee a Hong Kong, on a teste les resistances relatives de tels sous-systemes d'approvisionnement et variables d'intervention, en termes de leurs influences sur les resultats du projet. Cet article donne les resultats provisoires. On a notamment observe que les depassements de dates et de couts ne subissaient pas de facon importante l'influence des variables d'intervention choisies. Ces observations ont conduit au recensement des besoins particuliers pour mieux sonder l'influence des niveaux de performance d'approvisionnement. Cette evaluation des autres relations dans le modele propose devrait aider les clients et leurs conseillers a concevoir des systemes d'approvisionnement plus appropries et qui devraient etre axes sur les priorites particulieres de chaque projet.
Linking procurement systems to project priorities
The main objective of this work is to assess the impacts of various procurement variables on project performance, in comparison to the impacts of non-procurement related variables, such as project conditions and team characteristics. Since the impacts of specific procurement variables, such as contract type, have been investigated before, it was decided to first develop a comprehensive framework of procurement options. This framework is based on a holistic overview of procurement systems that included, for example, sub-systems of work packaging, and type of contract. A model was next developed to link the procurement system variables to project outcomes. Additional variables such as the characteristics of the project and the project participants were incorporated into this model as 'intervening' variables. A survey in Hong Kong tested the relative strengths of such procurement sub-systems and intervening variables, in terms of their influences on project outcomes. The interim results are described in this paper. This includes observations that cost and time overruns were not significantly influenced by the chosen intervening variables. Such observations led to the identification of particular needs to further probe the influences of team performance levels, as well as of procurement sub-systems. This evaluation of the other relationships in this proposed model will assist clients and their advisers to design more appropriate procurement systems, that should be geared to their particular project priorities. L'objectif principal de ce travail est d'evaluer les incidences de diverses variables d'approvisionnement sur l'execution d'un projet, par rapport aux incidences de variables qui ne sont pas liees aux approvisionnements, comme les conditions du projet et les caracteristiques de l'equipe. Les incidences des variables propres a un approvisionnement, comme le type de contrat, ayant deja ete examinees, on a decide de constituer tout d'abord un cadre complet des options d'approvisionnement. Ce cadre repose sur une vue generale holistique des systemes d'approvisionnement qui comprenaient, par exemple, des sous-systemes de lots de travail et la type de contrat. On a ensuite realise un modele pour lier les variables du systeme d'approvisionnement aux resultats du projet. D'autres variables comme les caracteristiques du projet et les participants ont ete integrees dans le modele comme variables 'd'intervention'. Dans le cadre d'une etude realisee a Hong Kong, on a teste les resistances relatives de tels sous-systemes d'approvisionnement et variables d'intervention, en termes de leurs influences sur les resultats du projet. Cet article donne les resultats provisoires. On a notamment observe que les depassements de dates et de couts ne subissaient pas de facon importante l'influence des variables d'intervention choisies. Ces observations ont conduit au recensement des besoins particuliers pour mieux sonder l'influence des niveaux de performance d'approvisionnement. Cette evaluation des autres relations dans le modele propose devrait aider les clients et leurs conseillers a concevoir des systemes d'approvisionnement plus appropries et qui devraient etre axes sur les priorites particulieres de chaque projet.
Linking procurement systems to project priorities
Kumaraswamy, Mohan M. (Autor:in) / Dissanayaka, Sunil M. (Autor:in)
Building Research & Information ; 26 ; 223-238
01.07.1998
16 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Linking procurement systems to project priorities
Online Contents | 1998
|Linking procurement systems to project priorities
British Library Online Contents | 1998
|Appropriate project procurement systems for hybrid TQM
British Library Conference Proceedings | 1999
|New Project Procurement Process
Online Contents | 2001
|