Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunnel for safe trafic
This work presents the project 'Tunnel for safe traffic' which is a result of two patent solutions. In this project, the safety elements in the tunnel include multifunctional prefabricated secondary lining 'Tribo-Beton', 3K ventilation 'Ekovent', fire extinguishing by water spray, video-surveillance and fire-alarm. After primary tunnel lining is placed, the elements forming a self-supporting arch are installed by using a special symmetrical scaffold. This scaffold enables the handling and placement of precast elements, which also serve as a self-supporting formwork for filling fresh concrete into the space between the elements and the primary tunnel lining. After having installed the 200 m secondary lining, the installation of 3-K ventilation elements can start. These precast elements will play a multiple role in tunnel construction and performance. Their special composite structure makes them fire and water-resistant. Their prefabricated nature keeps construction costs at an acceptable level. In addition, better quality of concrete is achieved in controllable factory conditions. The 'SKEMOT-3' scaffold specifically intended for such construction enables continous traffic even during the reconstruction of the tunnel, but with reasonable speed and traffic flow restrictions.
Tunnel for safe trafic
This work presents the project 'Tunnel for safe traffic' which is a result of two patent solutions. In this project, the safety elements in the tunnel include multifunctional prefabricated secondary lining 'Tribo-Beton', 3K ventilation 'Ekovent', fire extinguishing by water spray, video-surveillance and fire-alarm. After primary tunnel lining is placed, the elements forming a self-supporting arch are installed by using a special symmetrical scaffold. This scaffold enables the handling and placement of precast elements, which also serve as a self-supporting formwork for filling fresh concrete into the space between the elements and the primary tunnel lining. After having installed the 200 m secondary lining, the installation of 3-K ventilation elements can start. These precast elements will play a multiple role in tunnel construction and performance. Their special composite structure makes them fire and water-resistant. Their prefabricated nature keeps construction costs at an acceptable level. In addition, better quality of concrete is achieved in controllable factory conditions. The 'SKEMOT-3' scaffold specifically intended for such construction enables continous traffic even during the reconstruction of the tunnel, but with reasonable speed and traffic flow restrictions.
Tunnel for safe trafic
Tunnel für sicheren Verkehr
Planinc, R. (Autor:in) / Pavetic, J. (Autor:in) / Planinc, M. (Autor:in) / Tisovec, I. (Autor:in) / Bjegoci, D. (Autor:in) / Stipanovic, I. (Autor:in) / Drakulic, M. (Autor:in) / Carevic, M. (Autor:in)
2002
8 Seiten, 4 Bilder, 13 Quellen
Aufsatz (Konferenz)
Englisch
Online Contents | 2003
British Library Online Contents | 2005
IuD Bahn | 2003
|Online Contents | 1995
|Tunnel de Toulon (2e partie) - EQUIPEMENTS D'EXPLOITATION - La supervision du trafic
Online Contents | 2004
|