Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The opening of Kone's new corporate headquarters tower at Espo, Finland and installation of elevator was discussed. The TMS9900/GA control system was the underlying intelligence behind the elevator system. The design features of the installation required the glazed lift shafts to act as a heat valve and help in control of heat gain. The top and bottom of the shaft had automatic ventilation hatches to remove the excess heat.
The opening of Kone's new corporate headquarters tower at Espo, Finland and installation of elevator was discussed. The TMS9900/GA control system was the underlying intelligence behind the elevator system. The design features of the installation required the glazed lift shafts to act as a heat valve and help in control of heat gain. The top and bottom of the shaft had automatic ventilation hatches to remove the excess heat.
KONE HQ building
Gale, J. (Autor:in)
Elevator World ; 50 ; 50-53
2002
4 Seiten
Aufsatz (Zeitschrift)
Englisch
Skin Architecture - SARC Architects - KONE Building
Online Contents | 2002
Kone Building, Espoo - Arkkitehtitoimisto SARC Oy
Online Contents | 2002
Online Contents | 2011
REALISATIONS - Antti-Matti Siikala, siège social de Koné à Espoo, Finlande.
Online Contents | 2002
We have lift off: the latest news from elevator firms Kone and Otis
British Library Online Contents | 2002