Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Study on the Terminal Line Reasonable Position of Two Coal Seam under the Down-Protective Layer Pressure-Relieved Mining
In order to study the stress distribution and its dynamic influence law while the protective layer mining, based on the transfer law of mining-induced stress in the coal seam floor and in front of the working face, using numerical simulation software to simulate the surrounding rock stress under the different pillar width mining conditions, and carried through the roadway deformation engineering practice observations. It is shown that reserved 110 m coal pillar could weaken the impact on the front of the floor tunnel under the protective layer mining process. When the top liberated layer mining to reduce the impact of mining stress superposition, it should avoid the terminal lines on the two coal seams at the same location and may be staggered at least about 30 m ∼ 50 m. And it obtained that the roadway deformation not only by mining impact, but also considering the geological environment surrounding rock conditions, tunnel position in which layers of rock, rock properties and other factors. The research guided the engineering practice successfully.
Study on the Terminal Line Reasonable Position of Two Coal Seam under the Down-Protective Layer Pressure-Relieved Mining
In order to study the stress distribution and its dynamic influence law while the protective layer mining, based on the transfer law of mining-induced stress in the coal seam floor and in front of the working face, using numerical simulation software to simulate the surrounding rock stress under the different pillar width mining conditions, and carried through the roadway deformation engineering practice observations. It is shown that reserved 110 m coal pillar could weaken the impact on the front of the floor tunnel under the protective layer mining process. When the top liberated layer mining to reduce the impact of mining stress superposition, it should avoid the terminal lines on the two coal seams at the same location and may be staggered at least about 30 m ∼ 50 m. And it obtained that the roadway deformation not only by mining impact, but also considering the geological environment surrounding rock conditions, tunnel position in which layers of rock, rock properties and other factors. The research guided the engineering practice successfully.
Study on the Terminal Line Reasonable Position of Two Coal Seam under the Down-Protective Layer Pressure-Relieved Mining
Zhang, Xiang-Yang (Autor:in) / Tu, Min (Autor:in)
2013
5 Seiten
Aufsatz (Konferenz)
Englisch
Study of Reasonable Length of Coal Seam Mining under Different Fault Dips
British Library Conference Proceedings | 2014
|Protective coal seam and unmanned thin coal seam mining method
Europäisches Patentamt | 2015
|Mining Thickness Determination of Upper and Lower Protective Coal Seam in Pressure Relief Mining
Online Contents | 2018
|Mining Thickness Determination of Upper and Lower Protective Coal Seam in Pressure Relief Mining
Online Contents | 2018
|