Secondary Containment Retrofitting Using a Bituminous Geomembrane
The City of Portland (OR) requires that bulk fuel terminals install impervious secondary containments (i.e. liners) around tanks or facilities built after 2004. To satisfy this requirement when planning to replace a group of tanks with two large tanks at its Willbridge Terminal in Portland, (Oregon) Chevron compared different liner options. The site is essentially flat and numerous tanks, pipelines, and ancillary structures exist within the secondary containment so any earthwork to cover a liner or promote drainage would have been very difficult. The number of penetrations, pipe support, and pipes crisscrossing the facility favored a liner that could be pieced together and seamed easily. An exposed liner consisting of a 160 mil Bituminous Geomembrane was ranked as the optimum solution. The City of Portland approved the design and the liner was installed in 2010 and has worked to the satisfaction of the Terminal operators. The paper describes the selection process, design, installation, and performance of the geomembrane thus far.
Secondary Containment Retrofitting Using a Bituminous Geomembrane
The City of Portland (OR) requires that bulk fuel terminals install impervious secondary containments (i.e. liners) around tanks or facilities built after 2004. To satisfy this requirement when planning to replace a group of tanks with two large tanks at its Willbridge Terminal in Portland, (Oregon) Chevron compared different liner options. The site is essentially flat and numerous tanks, pipelines, and ancillary structures exist within the secondary containment so any earthwork to cover a liner or promote drainage would have been very difficult. The number of penetrations, pipe support, and pipes crisscrossing the facility favored a liner that could be pieced together and seamed easily. An exposed liner consisting of a 160 mil Bituminous Geomembrane was ranked as the optimum solution. The City of Portland approved the design and the liner was installed in 2010 and has worked to the satisfaction of the Terminal operators. The paper describes the selection process, design, installation, and performance of the geomembrane thus far.
Secondary Containment Retrofitting Using a Bituminous Geomembrane
Liebe, Kurt (Autor:in) / Hadj-Hamou, Tarik (Autor:in)
2013
9 Seiten, Bilder, Tabellen
Aufsatz (Konferenz)
Datenträger
Englisch
Sicherheitsbehälter , Rohrstütze , Installation , Pipeline , Betriebsanlage , Geomembran , Brennstoff , Erdbau , Bitumen , Tank
Bituminous geomembrane in mine construction
TIBKAT | 2018
|Bituminous geomembrane in extremely cold conditions
British Library Conference Proceedings | 2006
|Prefabricated Bituminous Geomembrane: A candidate for Exposed Geomembrane Caps for Landfill Closures
British Library Conference Proceedings | 2008
|Dam construction at Diavik using bituminous geomembrane liners
British Library Conference Proceedings | 2008
|Use of Bituminous Geomembrane in Harsh Conditions
Tema Archiv | 2013
|