Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ZAMBELLI photovoltaic pumping station (70 kWp) - plant improvements and results
Following 4 years of operation, the ZAMBELLI PV pumping station has undergone significant improvements in automatic plant control and monitoring. The technical characteristics of the new automatic plant controller and of the remote sensing and monitoring system are presented, as well as design concepts and features of the automatic plant supervisor software. - Problems and lessons learned on the plant are illustrated and discussed in view of the need to increase system reliability. First operating results and data gathered on the improved plant configuration shall be presented on the 9th European Photovoltaic Solar Energy Conference in Freiburg.
ZAMBELLI photovoltaic pumping station (70 kWp) - plant improvements and results
Following 4 years of operation, the ZAMBELLI PV pumping station has undergone significant improvements in automatic plant control and monitoring. The technical characteristics of the new automatic plant controller and of the remote sensing and monitoring system are presented, as well as design concepts and features of the automatic plant supervisor software. - Problems and lessons learned on the plant are illustrated and discussed in view of the need to increase system reliability. First operating results and data gathered on the improved plant configuration shall be presented on the 9th European Photovoltaic Solar Energy Conference in Freiburg.
ZAMBELLI photovoltaic pumping station (70 kWp) - plant improvements and results
Photovoltaische ZAMBELLI-Pumpstation (10 kWp), Anlagenverbesserung und Ergebnisse
Sorokin, A. (Autor:in) / Braggion, D. (Autor:in)
1989
4 Seiten, 5 Bilder
Aufsatz (Konferenz)
Englisch
British Library Online Contents | 1998
La purezza de distacco - progetto di Felice Zambelli
Online Contents | 1999
Neuartige Fahrregalanlage beim WDR in Koeln: ZAMBELLI Gleitregalsystem MAXITHEK - "eine runde Sache"
British Library Online Contents | 1997
Toronto's New Purification Plant and Pumping Station
Wiley | 1941
|