Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Coupled Analysis of Reinforced Concrete Lining with High External and Internal Water Pressure
Considering reinforced concrete lining often using in underground diversion tunnels as permeable media and combining concrete smeared cracking model, equivalent continuum porous saturated hydro-mechanical coupling model of lining is established based on generalized Biot’s theory. Reinforcement in concrete structures is typically provided by means of rebars which are embedded in the concrete. Then the model is applied to analyze lining structures of Jinping diversion tunnels during excavation and operation processes in which high external and internal water pressure would play a dominant role in affecting the behavior of lining respectively. Coupling research are carried out to analyze some important factors that would influence the hydro-mechanical behavior of lining and surrounding rock mass such as decreased orders of hydraulic conductivity magnitude of grouting zone, internal water pressure acting as body force and existing cracks in the lining, and the results shows that grouting zone of good quality and sufficient measurement for preventing the cracks from initiation and coalescence in the lining are important for the construction and operation of the diversion tunnels.
Coupled Analysis of Reinforced Concrete Lining with High External and Internal Water Pressure
Considering reinforced concrete lining often using in underground diversion tunnels as permeable media and combining concrete smeared cracking model, equivalent continuum porous saturated hydro-mechanical coupling model of lining is established based on generalized Biot’s theory. Reinforcement in concrete structures is typically provided by means of rebars which are embedded in the concrete. Then the model is applied to analyze lining structures of Jinping diversion tunnels during excavation and operation processes in which high external and internal water pressure would play a dominant role in affecting the behavior of lining respectively. Coupling research are carried out to analyze some important factors that would influence the hydro-mechanical behavior of lining and surrounding rock mass such as decreased orders of hydraulic conductivity magnitude of grouting zone, internal water pressure acting as body force and existing cracks in the lining, and the results shows that grouting zone of good quality and sufficient measurement for preventing the cracks from initiation and coalescence in the lining are important for the construction and operation of the diversion tunnels.
Coupled Analysis of Reinforced Concrete Lining with High External and Internal Water Pressure
Advanced Materials Research ; 361-363 ; 1922-1925
07.10.2011
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Concrete lining internal and external water pressure difference adjusting device
Europäisches Patentamt | 2025
|Shaft lining with reinforced concrete
Engineering Index Backfile | 1911
|Lining ditches with reinforced concrete
Engineering Index Backfile | 1913
High Pressure Penstock - Concrete Lining
British Library Conference Proceedings | 2002
|Hydro-mechanical interaction analysis of reinforced concrete lining in pressure tunnels
British Library Online Contents | 2017
|