Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Based on investigation and survey, the conformation and the distribution for underground goaf are gotten. The goaf can be completely filled by drilling holes and grouting with the mixture of sand and water, using masonry border to isolate and filtrate the filled space and unfilled space. The shaft fills with cement stabilized soil without settlement. The result shows that latent threats remove during expressway opening for 10 years and achieve expected technical feasibility, economy, and rationality.
Based on investigation and survey, the conformation and the distribution for underground goaf are gotten. The goaf can be completely filled by drilling holes and grouting with the mixture of sand and water, using masonry border to isolate and filtrate the filled space and unfilled space. The shaft fills with cement stabilized soil without settlement. The result shows that latent threats remove during expressway opening for 10 years and achieve expected technical feasibility, economy, and rationality.
Goaf Treatment for Gold Mine under Expressway
Applied Mechanics and Materials ; 178-181 ; 1218-1221
14.05.2012
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Goaf Treatment for Gold Mine under Expressway
Tema Archiv | 2012
|Treatment method for underlying goaf of expressway roadbed
Europäisches Patentamt | 2024
|Integrated Treatment Technology of Storage-Mining Inclined Goaf under Expressway
DOAJ | 2020
|Mine goaf area water plant foundation treatment method
Europäisches Patentamt | 2022
|