Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A Backfill Clay Method for Small Earth Dam’s Anti-Seepage and Reinforcement Engineering
A backfill clay method which is often adopted in small earth dam’ anti-seepage and reinforcement engineering has been introduced, and its using experiences in Zhejiang province, east of china, has been summarized. The design and construction process using the method has both been represented in the paper, with several technical difficulties had been selectively discussed. Application in hundreds of dams during the past decade showed that the method is characteristic of short working term, low cost, no need of many oversize machine, simple working technology and convenient application.
A Backfill Clay Method for Small Earth Dam’s Anti-Seepage and Reinforcement Engineering
A backfill clay method which is often adopted in small earth dam’ anti-seepage and reinforcement engineering has been introduced, and its using experiences in Zhejiang province, east of china, has been summarized. The design and construction process using the method has both been represented in the paper, with several technical difficulties had been selectively discussed. Application in hundreds of dams during the past decade showed that the method is characteristic of short working term, low cost, no need of many oversize machine, simple working technology and convenient application.
A Backfill Clay Method for Small Earth Dam’s Anti-Seepage and Reinforcement Engineering
Applied Mechanics and Materials ; 71-78 ; 1370-1374
27.07.2011
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
A Backfill Clay Method for Small Earth Dam's Anti-Seepage and Reinforcement Engineering
British Library Conference Proceedings | 2011
|Electro-osmosis stabilizes Earth dam's tricky foundation clay
Engineering Index Backfile | 1966
The Rehabilitation of Vermont's Waterbury Dam's Seepage Control Components by Innovative Schemes
British Library Conference Proceedings | 2004
|Reservoir Aging and Reinforcement Measures for Dam's Safety
British Library Conference Proceedings | 2006
|High-backfill artificial lake anti-seepage system and construction method
Europäisches Patentamt | 2023
|