Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Controlled Blasting for Subgrade Near Bridge Abutment
The subgrade at the end of a bridge near some important buildings,such as bridge abutment and 500KV transmission line. To meet of the demand of construction period, Different technique of blasting benches were adopted in different district. And meanwhile,safety control was also strengthened in the blasting operation. The blasting successfully made the bridge abutment and the fly-rock under control.
Controlled Blasting for Subgrade Near Bridge Abutment
The subgrade at the end of a bridge near some important buildings,such as bridge abutment and 500KV transmission line. To meet of the demand of construction period, Different technique of blasting benches were adopted in different district. And meanwhile,safety control was also strengthened in the blasting operation. The blasting successfully made the bridge abutment and the fly-rock under control.
Controlled Blasting for Subgrade Near Bridge Abutment
Advanced Materials Research ; 368-373 ; 2787-2790
24.10.2011
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Controlled Blasting for Subgrade Near Bridge Abutment
British Library Conference Proceedings | 2012
|Abutment back for preventing high-fill subgrade bridge abutment traffic jump
Europäisches Patentamt | 2015
|Research on Permeability Regularities in Subgrade behind the Bridge Abutment
Tema Archiv | 2012
|Large scale blasting for the abutment of a bridge
Online Contents | 1986
|Large scale blasting for the abutment of a bridge
Springer Verlag | 1986
|