Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Temperature Control Measures and Feedback Analysis in Rapid Construction of Guandi RCC Dam
Due to the shortcomings of conventional methods, the temperature control in rapid construction of Guandi dam is less effective. Then improved measures are designed and implemented based on the dynamic control method of pipe cooling, which depends on the real-time adjustment of five factors affecting pipe cooling (beginning time of cooling, lasting time of cooling, water temperature, rate of flow and direction of flow). The monitoring and feedback calculation are conducted. It is found that the newly-designed measures have obvious effect, and that there are no harmful cracks in the whole construction of Guandi dam. The conclusion is that it can effectively solve the problem of temperature control and crack prevention of high RCC dam via these measures, and provide some guide and reference to other similar projects.
Temperature Control Measures and Feedback Analysis in Rapid Construction of Guandi RCC Dam
Due to the shortcomings of conventional methods, the temperature control in rapid construction of Guandi dam is less effective. Then improved measures are designed and implemented based on the dynamic control method of pipe cooling, which depends on the real-time adjustment of five factors affecting pipe cooling (beginning time of cooling, lasting time of cooling, water temperature, rate of flow and direction of flow). The monitoring and feedback calculation are conducted. It is found that the newly-designed measures have obvious effect, and that there are no harmful cracks in the whole construction of Guandi dam. The conclusion is that it can effectively solve the problem of temperature control and crack prevention of high RCC dam via these measures, and provide some guide and reference to other similar projects.
Temperature Control Measures and Feedback Analysis in Rapid Construction of Guandi RCC Dam
Advanced Materials Research ; 594-597 ; 1979-1982
29.11.2012
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Temperature Control Measures and Feedback Analysis in Rapid Construction of Guandi RCC Dam
British Library Conference Proceedings | 2012
|British Library Conference Proceedings | 2012
|Deterministic 3D Seismic Damage Analysis of Guandi Concrete Gravity Dam
Springer Verlag | 2020
|Trans Tech Publications | 2011
|Deterministic 3D seismic damage analysis of Guandi concrete gravity dam: A case study
Online Contents | 2017
|