Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Simulation Analysis on Construction of Liangjiang Great Bridge
Liangjiang Great Bridge is the prestressed concrete continuous rigid frame bridge with high pier and long-span. It adopts the segmented cantilever construction method. The process of its construction is the key to the construction control simulation analysis. In this paper, based on the characteristics of the bridge construction, finite element method is used to establish the simulation model. Cantilever construction stages and closure stages of bridge are simulated and analyzed. The structure deflection diagrams in the each section construction and the later construction considering the creep and shrinkage of concrete are obtained. The initial camber of each segment is given in the construction. The stress characteristics of key section are analyzed in the construction process. It provides a basis for monitoring and on-site construction of bridge and the reference for similar bridge construction.
Simulation Analysis on Construction of Liangjiang Great Bridge
Liangjiang Great Bridge is the prestressed concrete continuous rigid frame bridge with high pier and long-span. It adopts the segmented cantilever construction method. The process of its construction is the key to the construction control simulation analysis. In this paper, based on the characteristics of the bridge construction, finite element method is used to establish the simulation model. Cantilever construction stages and closure stages of bridge are simulated and analyzed. The structure deflection diagrams in the each section construction and the later construction considering the creep and shrinkage of concrete are obtained. The initial camber of each segment is given in the construction. The stress characteristics of key section are analyzed in the construction process. It provides a basis for monitoring and on-site construction of bridge and the reference for similar bridge construction.
Simulation Analysis on Construction of Liangjiang Great Bridge
Applied Mechanics and Materials ; 587-589 ; 1698-1702
04.07.2014
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Simulation Analysis on Construction of Liangjiang Great Bridge
British Library Conference Proceedings | 2014
|A Research of the Green Traffic Planning Strategies in Liangjiang New Area
British Library Conference Proceedings | 2013
|State rescaling and national new area development in China: The case of Chongqing Liangjiang
Online Contents | 2015
|British Library Conference Proceedings | 2012
|Construction of railway bridge at Boston Manor (Great Britain)
Engineering Index Backfile | 1964
|