Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Numerical Modelling of Prefabricated Vertical Drain for Soft Clay Using ABAQUS
Construction, buildings and infrastructure founded on soft clays are often affected by settlement problem. Therefore, Prefabricated Vertical Drain (PVD) is one of the best solutions to accelerate soil consolidation by shortening the drainage path. In this study, numerical investigation was carried out to pursue a better understanding of the consolidation behavior of soft clay improved with PVD. The consolidation process accelerated by PVD with surcharge of 50 kPa was analysed using the ABAQUS software by adopting an elastic model. The aim of this study is to compare the settlement and the required time to fully consolidate the soft soil at different drain spacings (1.0 m, 1.5 m and 2.0 m) for two different thickness of the clay layer. The results shows that the time required to completely consolidate the soft soil for 12 m and 20 m thickness of clay layer with different spacings are in the range of 3 months to 66 months. The settlement rate and excess pore water pressure dissipation are increased when the spacing of the drain closer.
Numerical Modelling of Prefabricated Vertical Drain for Soft Clay Using ABAQUS
Construction, buildings and infrastructure founded on soft clays are often affected by settlement problem. Therefore, Prefabricated Vertical Drain (PVD) is one of the best solutions to accelerate soil consolidation by shortening the drainage path. In this study, numerical investigation was carried out to pursue a better understanding of the consolidation behavior of soft clay improved with PVD. The consolidation process accelerated by PVD with surcharge of 50 kPa was analysed using the ABAQUS software by adopting an elastic model. The aim of this study is to compare the settlement and the required time to fully consolidate the soft soil at different drain spacings (1.0 m, 1.5 m and 2.0 m) for two different thickness of the clay layer. The results shows that the time required to completely consolidate the soft soil for 12 m and 20 m thickness of clay layer with different spacings are in the range of 3 months to 66 months. The settlement rate and excess pore water pressure dissipation are increased when the spacing of the drain closer.
Numerical Modelling of Prefabricated Vertical Drain for Soft Clay Using ABAQUS
Applied Mechanics and Materials ; 773-774 ; 1502-1507
15.07.2015
6 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Numerical Modeling of Mumbai Marine Clay Improved with Prefabricated Vertical Drain
Springer Verlag | 2024
|Numerical Modeling of Prefabricated Vertical Drain
British Library Online Contents | 2000
|Numerical Modeling of Soft Clay Improved with Prefabricated Vertical Drains
Springer Verlag | 2021
|Case Studies of Prefabricated Vertical Drain in Keelung River Clay
British Library Conference Proceedings | 1998
|