Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rehabilitation Technology for Excessive Large Gap of Joint between Caissons of Gravity Wharf
Excessive large gap of joint between caissons easily lead to the rear backfill leaking into harbor basin, to cause a differential settlement of the rear terminals and even affect the structural stability. With the case about caisson wharf of a harbor in southern China, this paper puts forward a rehabilitation technology of caisson joints with mold bag concrete as the major filler. The key technologies are introduced in detail including the mold bag production and installation, the height computation of laminated pouring of concrete and underwater concreting, etc. This technical maintenance is reasonable in economy and practicable in technology, worthy of promotion.
Rehabilitation Technology for Excessive Large Gap of Joint between Caissons of Gravity Wharf
Excessive large gap of joint between caissons easily lead to the rear backfill leaking into harbor basin, to cause a differential settlement of the rear terminals and even affect the structural stability. With the case about caisson wharf of a harbor in southern China, this paper puts forward a rehabilitation technology of caisson joints with mold bag concrete as the major filler. The key technologies are introduced in detail including the mold bag production and installation, the height computation of laminated pouring of concrete and underwater concreting, etc. This technical maintenance is reasonable in economy and practicable in technology, worthy of promotion.
Rehabilitation Technology for Excessive Large Gap of Joint between Caissons of Gravity Wharf
Applied Mechanics and Materials ; 501-504 ; 1032-1038
16.01.2014
7 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Rehabilitation Technology for Excessive Large Gap of Joint between Caissons of Gravity Wharf
British Library Conference Proceedings | 2014
|Concrete Box Caissons Earth-Retaining Wharf Structure
British Library Conference Proceedings | 1995
|Concrete caissons sunk in place for wharf and seawall
Engineering Index Backfile | 1923
|Pumpcrete conveys tremie concrete to 90-Ft loading wharf caissons
Engineering Index Backfile | 1943
|Lining of joint between two caissons
Engineering Index Backfile | 1942
|