Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Improved Design of Long Tunnel’s Cement Concrete Pavement Slab Length
Temperature field on the road inside the tunnel has a significant difference with normal road surface temperature field, according to the actual situation of the temperature inside the tunnel, calculate the slab length of the cement concrete pavement, obtained the conclusion that cement concrete road slab can be longer inside the tunnel, the conclusion has practical significance for the construction of cement concrete pavement inside the tunnel.
Improved Design of Long Tunnel’s Cement Concrete Pavement Slab Length
Temperature field on the road inside the tunnel has a significant difference with normal road surface temperature field, according to the actual situation of the temperature inside the tunnel, calculate the slab length of the cement concrete pavement, obtained the conclusion that cement concrete road slab can be longer inside the tunnel, the conclusion has practical significance for the construction of cement concrete pavement inside the tunnel.
Improved Design of Long Tunnel’s Cement Concrete Pavement Slab Length
Applied Mechanics and Materials ; 190-191 ; 496-499
26.07.2012
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Fabricated cement concrete pavement slab and construction method
Europäisches Patentamt | 2021
|Concrete Slab Length and Thickness Optimization for Long-Term Concrete Pavement in Ohio
Springer Verlag | 2023
|Fabricated cement concrete pavement slab structure for long-term performance networking observation
Europäisches Patentamt | 2023
|Tunnel's today... but tomorrow?
British Library Online Contents | 1998
|Regeneration repair method for cement concrete pavement broken slab
Europäisches Patentamt | 2021
|