Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stability Analysis to the Imports Slope of the Spillway Tunnel of a Hydropower Station
Taking limit equilibrium calculation program SLIDE for the platform and establishing two-dimensional model of excavation slope. Based on unloading rock mass mechanics theory and method and considered the natural, excavation, reinforcement, water, rainfall, and other complex conditions to Study on the stability of slope during construction and operation, then using the outcome of the limit equilibrium method to give their assessment of slope stability. Analysis pointed out that : the high excavation slope basic in a stable state.
Stability Analysis to the Imports Slope of the Spillway Tunnel of a Hydropower Station
Taking limit equilibrium calculation program SLIDE for the platform and establishing two-dimensional model of excavation slope. Based on unloading rock mass mechanics theory and method and considered the natural, excavation, reinforcement, water, rainfall, and other complex conditions to Study on the stability of slope during construction and operation, then using the outcome of the limit equilibrium method to give their assessment of slope stability. Analysis pointed out that : the high excavation slope basic in a stable state.
Stability Analysis to the Imports Slope of the Spillway Tunnel of a Hydropower Station
Advanced Materials Research ; 594-597 ; 1936-1939
29.11.2012
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Stability Analysis to the Imports Slope of the Spillway Tunnel of a Hydropower Station
British Library Conference Proceedings | 2012
|Pressure Distribution of Pressure and Non-Pressure Sections of a Hydropower Station Spillway Tunnel
Trans Tech Publications | 2014
|Anti-icing system for spillway gate of hydropower station
Europäisches Patentamt | 2022
|Stability Analysis of Diversion Tunnel Inlet Slope at Right Bank of Jinchuan Hydropower Station
Trans Tech Publications | 2012
|Stability Analysis of Slope and Diversion Water Tunnel of Hydropower Station under Strong Earthquake
Online Contents | 2020
|