Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The control of concrete crack is a complicated and difficult problem for civil engineering. It is more difficult to control the crack of the concrete poured in winter. Thorough the analysis of the construction of Shenyang subway in winter, a combination of methods are applied. Frost proof and decreasing the temperature stress of concrete are considered together. The combination of antifreezing measures and decreasing the temperature stress of concrete make the construction quality arrive a satisfying level.
The control of concrete crack is a complicated and difficult problem for civil engineering. It is more difficult to control the crack of the concrete poured in winter. Thorough the analysis of the construction of Shenyang subway in winter, a combination of methods are applied. Frost proof and decreasing the temperature stress of concrete are considered together. The combination of antifreezing measures and decreasing the temperature stress of concrete make the construction quality arrive a satisfying level.
The Study on the Control of the Early-Stage Crack of the Concrete Poured in Winter in Shenyang Subway
Advanced Materials Research ; 671-674 ; 1135-1139
11.03.2013
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
British Library Conference Proceedings | 2013
|Research on early Concrete Crack Control of Shijiazhuang Subway Construction in Winter
Trans Tech Publications | 2014
|Research on early Concrete Crack Control of Shijiazhuang Subway Construction in Winter
British Library Conference Proceedings | 2014
|Poured concrete and field control of concrete
Engineering Index Backfile | 1930
|Study on Subway Safety Measures and Emergency Rescue's Countermeasures in Shenyang
British Library Conference Proceedings | 2013
|