Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Risk Evaluation Model of Construction Project Contract Based on BP Neural Network
According to the current risk management of construction contract in China, put forward the idea of using neural network method to evaluate the risk in construction contract. Designed a comprehensive multi-indicator model for evaluating the construction contract risk based on BP Neural Network. This model can be used for simulating and evaluating the risk in construction contract in future. It has been proved that the desired results can be achieved by using this model.
The Risk Evaluation Model of Construction Project Contract Based on BP Neural Network
According to the current risk management of construction contract in China, put forward the idea of using neural network method to evaluate the risk in construction contract. Designed a comprehensive multi-indicator model for evaluating the construction contract risk based on BP Neural Network. This model can be used for simulating and evaluating the risk in construction contract in future. It has been proved that the desired results can be achieved by using this model.
The Risk Evaluation Model of Construction Project Contract Based on BP Neural Network
Applied Mechanics and Materials ; 357-360 ; 2304-2307
08.08.2013
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
The Risk Evaluation Model of Construction Project Contract Based on BP Neural Network
British Library Conference Proceedings | 2013
|Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model
British Library Online Contents | 2008
|Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model
Online Contents | 2008
|Research on Engineering Project Risk Evaluation System Based on Neural Network
British Library Conference Proceedings | 2005
|Risk Evaluation Model of Highway Tunnel Portal Construction Based on BP Fuzzy Neural Network
DOAJ | 2018
|