Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Technology Research on Rapid Excavation of Large Section Super-Long Coal Roadway
The design construction length of conveyance roadway of the mine working face is nearly 5000m and the section area of driving is 18m2, belongs to large section super-long coal roadway. Through advanced mechanized supporting facilities tunneling construction and using reasonable support pattern and labor organization, it ensured the safety of workers, reduced the labor intensity, and realized the safety and rapid excavation with 440m/month. The economic and social benefit is obviously. It could provide reference meaning for other large section coal roadway rapid excavation at home and abroad.
Technology Research on Rapid Excavation of Large Section Super-Long Coal Roadway
The design construction length of conveyance roadway of the mine working face is nearly 5000m and the section area of driving is 18m2, belongs to large section super-long coal roadway. Through advanced mechanized supporting facilities tunneling construction and using reasonable support pattern and labor organization, it ensured the safety of workers, reduced the labor intensity, and realized the safety and rapid excavation with 440m/month. The economic and social benefit is obviously. It could provide reference meaning for other large section coal roadway rapid excavation at home and abroad.
Technology Research on Rapid Excavation of Large Section Super-Long Coal Roadway
Advanced Materials Research ; 1010-1012 ; 1560-1563
13.08.2014
4 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Research and Application of Low Density Roof Support Technology of Rapid Excavation for Coal Roadway
Online Contents | 2019
|Research and Application of Low Density Roof Support Technology of Rapid Excavation for Coal Roadway
Online Contents | 2019
|Small excavation crusher for underground roadway of coal mine
Europäisches Patentamt | 2020
|An Experimental Research on Surrounding Rock Unloading during Solid Coal Roadway Excavation
DOAJ | 2021
|