During the pipe jacking construction, the bearing plates of jack need the support of great reactive force which is provided by the side-wall of the working shaft and the soil mass behind the wall. In the shallow pipe-jacking working shaft, the soil mass only can provide limited reactive force due to the small height of the soil mass behind the side-wall, which becomes the difficult point in the design and construction of the shallow pipe-jacking working shaft. This thesis takes the actual projects for the examples to introduce the construction technology of shallow pipe-jacking working shaft in details, including the construction key points like pre-grouting injection consolidation, ring beam construction method as well as reverse construction method.
During the pipe jacking construction, the bearing plates of jack need the support of great reactive force which is provided by the side-wall of the working shaft and the soil mass behind the wall. In the shallow pipe-jacking working shaft, the soil mass only can provide limited reactive force due to the small height of the soil mass behind the side-wall, which becomes the difficult point in the design and construction of the shallow pipe-jacking working shaft. This thesis takes the actual projects for the examples to introduce the construction technology of shallow pipe-jacking working shaft in details, including the construction key points like pre-grouting injection consolidation, ring beam construction method as well as reverse construction method.
Construction Technology of Shallow Pipe- Jacking Working Shaft
Key Engineering Materials ; 480-481 ; 1266-1270
30.06.2011
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Construction Technology of Shallow Pipe- Jacking Working Shaft
Tema Archiv | 2011
|Construction Technology of Shallow Pipe- Jacking Working Shaft
British Library Online Contents | 2011
|Europäisches Patentamt | 2022
|Complex stratum pipe jacking working well and construction technology thereof
Europäisches Patentamt | 2022
|Pipe jacking device and pipe jacking construction process
Europäisches Patentamt | 2020
|