Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction Engineering Bidding Risk Analysis
In the Bill of Quantities mode, the bidder must take risks of his tender offer. This paper researched on the uncertainty of construction projects costs, proposed Monte Carlo simulation method and procedure to simulate the construction projects costs on the basis of the construction projects costs conform to the characteristics of normal distribution, and also put forward a method to calculate risks of the tender offer in accordance with the established bidding strategy, which are helpful to the risk management and control of project contracting enterprises.
Construction Engineering Bidding Risk Analysis
In the Bill of Quantities mode, the bidder must take risks of his tender offer. This paper researched on the uncertainty of construction projects costs, proposed Monte Carlo simulation method and procedure to simulate the construction projects costs on the basis of the construction projects costs conform to the characteristics of normal distribution, and also put forward a method to calculate risks of the tender offer in accordance with the established bidding strategy, which are helpful to the risk management and control of project contracting enterprises.
Construction Engineering Bidding Risk Analysis
Advanced Materials Research ; 671-674 ; 2990-2994
11.03.2013
5 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Construction Engineering Bidding Risk Analysis
British Library Conference Proceedings | 2013
|Competitor analysis in construction bidding
British Library Online Contents | 2010
|Competitor analysis in construction bidding
Online Contents | 2010
|Competitor analysis in construction bidding
Taylor & Francis Verlag | 2010
|Optimizing Construction Bidding
British Library Conference Proceedings | 1996
|