Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Design of Blasting Demolition of the Reinforced Concrete Chimney Based on Complicated Conditions
Reinforced concrete chimney lining initiation time should be slightly behind the outer wall. Adopting blasting scheme of preliminary demolition and big blasting cut is helpful to control the collapse of chimney and reduce the blasting vibration directions. Combined with a real blasting engineering, blasting demolition design of the reinforced concrete chimney under complex environmental condition was introduced.
The Design of Blasting Demolition of the Reinforced Concrete Chimney Based on Complicated Conditions
Reinforced concrete chimney lining initiation time should be slightly behind the outer wall. Adopting blasting scheme of preliminary demolition and big blasting cut is helpful to control the collapse of chimney and reduce the blasting vibration directions. Combined with a real blasting engineering, blasting demolition design of the reinforced concrete chimney under complex environmental condition was introduced.
The Design of Blasting Demolition of the Reinforced Concrete Chimney Based on Complicated Conditions
Applied Mechanics and Materials ; 477-478 ; 803-808
19.12.2013
6 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Method for high-notch blasting demolition of thin-wall reinforced concrete chimney
Europäisches Patentamt | 2021
|Failure Law of Supporting Part of Reinforced Concrete Chimney by Blasting Demolition
Trans Tech Publications | 2012
|Failure Law of Supporting Part of Reinforced Concrete Chimney by Blasting Demolition
British Library Conference Proceedings | 2012
|British Library Conference Proceedings | 2012
|