Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Erstanwendung eines eigenen UHFB‐Systems in situ in Deutschland für die Bushaltestelle Olympia Einkaufszentrum in München
AbstractReporting about the first application of UHPC in situ in Germany. As Switzerland's leading construction provider Implenia has developed an in situ UHPC application in the last 10 years. We report about the general idea of UHPC, the materials behavior, the tasks and solutions as well as possible use cases for infrastructure projects in Germany for this Ultrahigh‐Performance‐Concrete (UHPC)
Erstanwendung eines eigenen UHFB‐Systems in situ in Deutschland für die Bushaltestelle Olympia Einkaufszentrum in München
AbstractReporting about the first application of UHPC in situ in Germany. As Switzerland's leading construction provider Implenia has developed an in situ UHPC application in the last 10 years. We report about the general idea of UHPC, the materials behavior, the tasks and solutions as well as possible use cases for infrastructure projects in Germany for this Ultrahigh‐Performance‐Concrete (UHPC)
Erstanwendung eines eigenen UHFB‐Systems in situ in Deutschland für die Bushaltestelle Olympia Einkaufszentrum in München
ce papers
Wagner, Jörg‐Peter (Autor:in) / Riedl, Ronald (Autor:in) / Braun, Matthias (Autor:in) / Sikorski, Oliver (Autor:in)
ce/papers ; 6 ; 844-848
01.12.2023
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
U-Bahn Kreuzungsbauwerk "Olympia-Einkaufszentrum" in München
IuD Bahn | 2002
|U-Bahn Kreuzungsbauwerk "Olympia-Einkaufszentrum" in München
Tema Archiv | 2002
|BAUAUSFÜHRUNG - U-Bahn Kreuzungsbauwerk - "Olympia-Einkaufszentrum" in München
Online Contents | 2002
|München: U-Bahnlinie U3 bis Olympia-Einkaufszentrum verlängert
IuD Bahn | 2007
|