Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Neural Network‐Based Long‐Term Hydropower Forecasting System
Artificial neural networks are alternatives to stochastic models even if the optimization of their architectures remains a tricky problem. Two different approaches in long‐term forecasting of potential energy inflows using a feedforward neural network (FNN) and a recurrent neural network (RNN) are proposed. The problem of overfitting, particularly critical for limited hydrologic data records, is addressed using a new approach entitled optimal weight estimate procedure (OWEP). The efficiency of the two models using OWEP is assessed through multistep forecasts. The experiment results show that, in general, OWEP improves the models' performance and significantly reduces the training time on the order of 60 percent. The RNN outperforms the FNN but costs about a factor of 2 longer in training time. Furthermore, the neural network‐based models provide more accurate forecasts than traditional stochastic models. Overall, the RNN appears to be the best suited for potential energy inflows forecasting and therefore for hydropower systems management and planning.
Neural Network‐Based Long‐Term Hydropower Forecasting System
Artificial neural networks are alternatives to stochastic models even if the optimization of their architectures remains a tricky problem. Two different approaches in long‐term forecasting of potential energy inflows using a feedforward neural network (FNN) and a recurrent neural network (RNN) are proposed. The problem of overfitting, particularly critical for limited hydrologic data records, is addressed using a new approach entitled optimal weight estimate procedure (OWEP). The efficiency of the two models using OWEP is assessed through multistep forecasts. The experiment results show that, in general, OWEP improves the models' performance and significantly reduces the training time on the order of 60 percent. The RNN outperforms the FNN but costs about a factor of 2 longer in training time. Furthermore, the neural network‐based models provide more accurate forecasts than traditional stochastic models. Overall, the RNN appears to be the best suited for potential energy inflows forecasting and therefore for hydropower systems management and planning.
Neural Network‐Based Long‐Term Hydropower Forecasting System
Coulibaly, Paulin (Autor:in) / Anctil, François (Autor:in) / Bobée, Bernard (Autor:in)
Computer‐Aided Civil and Infrastructure Engineering ; 15 ; 355-364
01.09.2000
10 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Real Time Neural Network-Based Forecasting System for Hydropower Reservoirs
British Library Conference Proceedings | 1998
|Bayesian Statistic Forecasting Model for Middle-Term and Long-Term Runoff of a Hydropower Station
British Library Online Contents | 2013
|Bayesian Statistic Forecasting Model for Middle-Term and Long-Term Runoff of a Hydropower Station
Online Contents | 2013
|Enhanced Artificial Neural Network Inflow Forecasting Algorithm for Run-of-River Hydropower Plants
British Library Online Contents | 2002
|