Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Geothermal energy systems for major projects – design and construction / Geothermieanlagen bei Großprojekten – Planung und Umsetzung
The application of geothermal energy has increased in the last couple of years in order to provide the heating or cooling demands of major projects. Open systems using groundwater directly can be used for geothermal energy extraction as well as closed systems with absorber pipes installed in underground structures. An accurate design, which considers the requirements of the energy consumer in particular but also the subsoiland groundwater conditions, the foundation concept and the building structure, as well as project‐specific technical, legal and economic conditions, is required for economically efficient application. Diligent supervision is necessary during the construction stage to avoid any damage to absorber pipes, which could result in loss of performance.
Zur Deckung des Heiz‐ oder Kühlbedarfs bei Großprojekten wird in den letzten Jahren vermehrt auf eine Erdwärmenutzung gesetzt. Dabei kommen sowohl offene Systeme wie eine direkte Grundwassernutzung als auch geschlossene Systeme mit Absorberleitungen in erdberührten Bauteilen zur Anwendung. Für eine wirtschaftliche Umsetzung bedarf es zunächst einer sorgfältigen Planung, wobei insbesondere die Anforderungen des Nutzers, die Untergrund‐ und Grundwasserverhältnisse, das Gründungskonzept einschließlich der Gebäudestruktur sowie projektspezifische technische, rechtliche und wirtschaftliche Randbedingungen zu berücksichtigen sind. In der Bauphase ist für eine plangemäße Umsetzung mit besonderer Sorgfalt vorzugehen, um Beschädigungen der Absorberleitungen und somit Leistungsminderungen zu vermeiden.
Geothermal energy systems for major projects – design and construction / Geothermieanlagen bei Großprojekten – Planung und Umsetzung
The application of geothermal energy has increased in the last couple of years in order to provide the heating or cooling demands of major projects. Open systems using groundwater directly can be used for geothermal energy extraction as well as closed systems with absorber pipes installed in underground structures. An accurate design, which considers the requirements of the energy consumer in particular but also the subsoiland groundwater conditions, the foundation concept and the building structure, as well as project‐specific technical, legal and economic conditions, is required for economically efficient application. Diligent supervision is necessary during the construction stage to avoid any damage to absorber pipes, which could result in loss of performance.
Zur Deckung des Heiz‐ oder Kühlbedarfs bei Großprojekten wird in den letzten Jahren vermehrt auf eine Erdwärmenutzung gesetzt. Dabei kommen sowohl offene Systeme wie eine direkte Grundwassernutzung als auch geschlossene Systeme mit Absorberleitungen in erdberührten Bauteilen zur Anwendung. Für eine wirtschaftliche Umsetzung bedarf es zunächst einer sorgfältigen Planung, wobei insbesondere die Anforderungen des Nutzers, die Untergrund‐ und Grundwasserverhältnisse, das Gründungskonzept einschließlich der Gebäudestruktur sowie projektspezifische technische, rechtliche und wirtschaftliche Randbedingungen zu berücksichtigen sind. In der Bauphase ist für eine plangemäße Umsetzung mit besonderer Sorgfalt vorzugehen, um Beschädigungen der Absorberleitungen und somit Leistungsminderungen zu vermeiden.
Geothermal energy systems for major projects – design and construction / Geothermieanlagen bei Großprojekten – Planung und Umsetzung
Hofinger, Hans (Autor:in) / Markiewicz, Roman (Autor:in) / Adam, Dietmar (Autor:in) / Unterberger, Wolfgang (Autor:in)
Geomechanics and Tunnelling ; 3 ; 634-646
01.10.2010
13 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Geothermal energy systems for major projects - design and construction
Tema Archiv | 2010
|Integrierte Planung und Projektsteuerung in komplexen Großprojekten
IuD Bahn | 2012
|Raumstrukturelle Wirkungen von Großprojekten
UB Braunschweig | 1990
|Kommunikation bei Großprojekten
Wiley | 2015