An Analytic Approach to Scheduling Pipe Replacement
A procedure is described that uses the history of main breaks to forecast how the number of breaks would change with time if the pipe were not replaced; a separate analysis predicts the failure rate of newly installed pipes. These forecasts are combined with cost data and a discount rate that accounts for inflation to determine the optimal replacement date.
An Analytic Approach to Scheduling Pipe Replacement
A procedure is described that uses the history of main breaks to forecast how the number of breaks would change with time if the pipe were not replaced; a separate analysis predicts the failure rate of newly installed pipes. These forecasts are combined with cost data and a discount rate that accounts for inflation to determine the optimal replacement date.
An Analytic Approach to Scheduling Pipe Replacement
Shamir, Uri (Autor:in) / Howard, Charles D.D. (Autor:in)
Journal ‐ American Water Works Association ; 71 ; 248-258
01.05.1979
11 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Optimal Scheduling of Pipe Replacement
Wiley | 2017
|A New Pipe Replacement Approach
Wiley | 2002
|Optimal Scheduling of Water Pipe Replacement Using Genetic Algorithms
British Library Online Contents | 2001
|Optimal Scheduling of Pipe Replacement, Including Opportunity, Social and Environmental Costs
British Library Conference Proceedings | 2007
|TECHNICAL PAPERS - Optimal Scheduling of Water Pipe Replacement Using Genetic Algorithms
Online Contents | 2001
|