Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Errata
This errata corrects Figure 1 in the article, On Time and Under Budget: How Southern Colorado's Water Delivery Project Engineered Success, by John Fredell et al., in the March 2016 issue of Journal AWWA (Vol. 108 No. 3). This errata also makes a correction to the number referencing the Standard for Permanganates in the Standards Official Notice in the March 2016 issue of Journal AWWA (Vol. 108 No. 3).
Errata
This errata corrects Figure 1 in the article, On Time and Under Budget: How Southern Colorado's Water Delivery Project Engineered Success, by John Fredell et al., in the March 2016 issue of Journal AWWA (Vol. 108 No. 3). This errata also makes a correction to the number referencing the Standard for Permanganates in the Standards Official Notice in the March 2016 issue of Journal AWWA (Vol. 108 No. 3).
Errata
Journal ‐ American Water Works Association ; 108 ; 84
01.04.2016
1 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
ASCE | 2021
|ASCE | 2021
|ASCE | 2021
|ASCE | 2021
|Wiley | 2017