Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Capacity of the Construction Industry for Post‐Disaster Reconstruction: Post‐Tsunami Sri Lanka
This chapter contains sections titled:
Introduction
Impact of tsunami
Disaster risk management
Role of the construction sector in post‐disaster recovery
Post‐tsunami Sri Lanka: the role of the Sri Lankan construction industry
Capacity of the construction industry in post‐tsunami reconstruction
Summary
References
Capacity of the Construction Industry for Post‐Disaster Reconstruction: Post‐Tsunami Sri Lanka
This chapter contains sections titled:
Introduction
Impact of tsunami
Disaster risk management
Role of the construction sector in post‐disaster recovery
Post‐tsunami Sri Lanka: the role of the Sri Lankan construction industry
Capacity of the construction industry in post‐tsunami reconstruction
Summary
References
Capacity of the Construction Industry for Post‐Disaster Reconstruction: Post‐Tsunami Sri Lanka
Amaratunga, Dilanthi (Herausgeber:in) / Haigh, Richard (Herausgeber:in) / Seneviratne, Krisanthi (Autor:in)
17.07.2011
21 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
tsunami impact, physical ‐ socio‐economic, human and environmental aspects , disaster risk management ‐ pre‐disaster risk reduction phase, and post‐disaster recovery phase , tsunamis, and earthquakes, volcanic eruptions ‐ and landslips over oceans , waste management, and natural hazards ‐ crucial, need for guidelines , disaster frequency ‐ construction industry, an important role to play , reconstruction, and risk reduction ‐ safe locations, robust building codes and safety standards , construction industry capacity ‐ post‐disaster reconstruction, post‐tsunami Sri Lanka , tsunami, in Japanese, wave (nami) ‐ in harbour (tsu), long length, travelling waves , construction industry role ‐ in post‐tsunami Sri Lanka , post‐tsunami Sri Lanka ‐ role of Sri Lankan construction industry
Post‐tsunami reconstruction in sri lanka: Assessing the economic impact
BASE | 2010
|BASE | 2019
|Post-disaster construction & demolition debris management: a Sri Lanka case study
DOAJ | 2012
|Post-disaster construction & demolition debris management: a Sri Lanka case study
BASE | 2012
|