Semmering Base Tunnel completely under construction – Geotechnical prediction transforms to framework plan / Der Semmering‐Basistunnel: Von der geotechnischen Prognose zur tunnelbautechnischen Rahmenplanung
Since construction work of section SBT3.1 has started in May 2016, all contract sections of the Semmering Base Tunnel are under construction. Therefore, the geotechnical prediction designed for the tendering transforms to the framework planning required for construction. During the tendering process, the crucial aim of the geotechnical prediction is to depict the expected ranges of the general conditions for contract design and cost estimation. The framework planning for construction on the other hand defines the minimum requirements for tunnel driving at the expected ground conditions. The specification of requirements is set for all driving works – for tunnel and cross‐sections as well as for shafts and complex areas with caverns and therefore varies in expected ground conditions and in complexity of the structure. If the need for an adjustment is indicated on site, the framework plan can be revised in justified cases.
Seit dem Baubeginn im Baulos SBT3.1, im Mai 2016, sind alle drei Tunnelbaulose des Semmering‐Basistunnels in Bau. Damit erfolgt aus tunnelplanerischer Sicht der Übergang von der geotechnischen Prognose der Ausschreibungsplanung zur tunnelbautechnischen Rahmenplanung für die Bauausführung. In der Ausschreibungsphase ist das wesentlichste Ziel der Prognose die Darstellung der erwarteten Bandbreiten der Rahmenbedingungen für die Vertragsgestaltung und die Angebotskalkulation. Die Rahmenplanung für die Bauausführung wiederum hat zum Ziel die Mindestanforderungen für den Vortrieb unter den erwarteten Baugrundverhältnissen zu definieren. Diese Vorgaben erfolgen für sämtliche Vortriebsarbeiten – sowohl für die Tunnel und Querschläge als auch für die Schächte und die Kavernenbereiche – und unterscheiden sich nach den erwarteten Baugrundverhältnissen und der Komplexität des Bauwerks. Werden Anpassungserfordernisse vor Ort erkannt, erfolgt in begründeten Fällen eine Rahmenplanfortschreibung.
Semmering Base Tunnel completely under construction – Geotechnical prediction transforms to framework plan / Der Semmering‐Basistunnel: Von der geotechnischen Prognose zur tunnelbautechnischen Rahmenplanung
Since construction work of section SBT3.1 has started in May 2016, all contract sections of the Semmering Base Tunnel are under construction. Therefore, the geotechnical prediction designed for the tendering transforms to the framework planning required for construction. During the tendering process, the crucial aim of the geotechnical prediction is to depict the expected ranges of the general conditions for contract design and cost estimation. The framework planning for construction on the other hand defines the minimum requirements for tunnel driving at the expected ground conditions. The specification of requirements is set for all driving works – for tunnel and cross‐sections as well as for shafts and complex areas with caverns and therefore varies in expected ground conditions and in complexity of the structure. If the need for an adjustment is indicated on site, the framework plan can be revised in justified cases.
Seit dem Baubeginn im Baulos SBT3.1, im Mai 2016, sind alle drei Tunnelbaulose des Semmering‐Basistunnels in Bau. Damit erfolgt aus tunnelplanerischer Sicht der Übergang von der geotechnischen Prognose der Ausschreibungsplanung zur tunnelbautechnischen Rahmenplanung für die Bauausführung. In der Ausschreibungsphase ist das wesentlichste Ziel der Prognose die Darstellung der erwarteten Bandbreiten der Rahmenbedingungen für die Vertragsgestaltung und die Angebotskalkulation. Die Rahmenplanung für die Bauausführung wiederum hat zum Ziel die Mindestanforderungen für den Vortrieb unter den erwarteten Baugrundverhältnissen zu definieren. Diese Vorgaben erfolgen für sämtliche Vortriebsarbeiten – sowohl für die Tunnel und Querschläge als auch für die Schächte und die Kavernenbereiche – und unterscheiden sich nach den erwarteten Baugrundverhältnissen und der Komplexität des Bauwerks. Werden Anpassungserfordernisse vor Ort erkannt, erfolgt in begründeten Fällen eine Rahmenplanfortschreibung.
Semmering Base Tunnel completely under construction – Geotechnical prediction transforms to framework plan / Der Semmering‐Basistunnel: Von der geotechnischen Prognose zur tunnelbautechnischen Rahmenplanung
Wagner, Oliver K. (Autor:in) / Gobiet, Gerhard (Autor:in) / Druckfeuchter, Hubert (Autor:in)
Geomechanics and Tunnelling ; 9 ; 382-390
01.10.2016
9 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Semmering-Basistunnel, ein Projektsüberblick
Tema Archiv | 1995
|Südbahntagung 2009: Koralmtunnel - Semmering-Basistunnel
IuD Bahn | 2009
Semmering-Basistunnel, ein Projektsüberblick
IuD Bahn | 1995
|