Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The first, and it could be the last, thing to say about costs is that the architect should stay as far away from them as possible. Armed with the budget figure and briefing information, the quantity surveyor can produce a cost plan which allocates a sum of money to each element of the design. Importantly, so far as the architect is concerned, the quantity surveyor can tell the architect what types of construction and finishes can be used even to the extent of indicating the range of types of finishes for walls, ceilings, and floors and the comparative cost of using different constructional methods. As the design progresses, the detailed cost plan can be updated and become more and more accurate. Not only is this very helpful for the client, it is invaluable to the architect, who is effectively being given a toolkit specifically designed for that commission.
The first, and it could be the last, thing to say about costs is that the architect should stay as far away from them as possible. Armed with the budget figure and briefing information, the quantity surveyor can produce a cost plan which allocates a sum of money to each element of the design. Importantly, so far as the architect is concerned, the quantity surveyor can tell the architect what types of construction and finishes can be used even to the extent of indicating the range of types of finishes for walls, ceilings, and floors and the comparative cost of using different constructional methods. As the design progresses, the detailed cost plan can be updated and become more and more accurate. Not only is this very helpful for the client, it is invaluable to the architect, who is effectively being given a toolkit specifically designed for that commission.
Cost Planning
Chappell, David (Autor:in)
07.01.2020
2 pages
Aufsatz/Kapitel (Buch)
Elektronische Ressource
Englisch
TIBKAT | 1984
|UB Braunschweig | 1999
|Cost Reduction Through Planning
British Library Conference Proceedings | 1995
|Planning Level Tunnel Cost Estimation
British Library Conference Proceedings | 2010
|Cost planning, Budgeting and Control
TIBKAT | 1991
|