Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rate Increase Allowed Only at End of Two Years
Can a city increase the rate charged a public water system at any time during the life of a long‐term contract? The Supreme Court of Alabama ruled that increases could be imposed only at the expiration of a two‐year period.
Rate Increase Allowed Only at End of Two Years
Can a city increase the rate charged a public water system at any time during the life of a long‐term contract? The Supreme Court of Alabama ruled that increases could be imposed only at the expiration of a two‐year period.
Rate Increase Allowed Only at End of Two Years
01.04.1984
1 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Unilateral Rate Increase Allowed
Wiley | 1996
Increase allowed before new facilities operational
Wiley | 1982
Hypothetical tax expense not allowed in rate setting
Wiley | 1983