Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BRIDGE – ORANGE HEADQUARTERS – EAST AND WEST BRIDGES
At the top of Bridge building, the architect designed two crossings between opposing structural blocks, creating unique and privileged workspaces. They form the main structure of the various levels of roofs and give support to gardens, leisure areas and large glazed skylights. They are independent structural pieces supported by the building structure. This article addresses the solutions used as well as the cantilever construction method that has been implemented given the central and elevated location on site.
BRIDGE – ORANGE HEADQUARTERS – EAST AND WEST BRIDGES
At the top of Bridge building, the architect designed two crossings between opposing structural blocks, creating unique and privileged workspaces. They form the main structure of the various levels of roofs and give support to gardens, leisure areas and large glazed skylights. They are independent structural pieces supported by the building structure. This article addresses the solutions used as well as the cantilever construction method that has been implemented given the central and elevated location on site.
BRIDGE – ORANGE HEADQUARTERS – EAST AND WEST BRIDGES
Lopes<sup>*</sup>, Adriano (Autor:in) / Gonçalves, Sílvio (Autor:in) / Breda, Ricardo (Autor:in)
ce/papers ; 3 ; 31-42
01.12.2019
12 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
South West Water's new headquarters
Online Contents | 1993
Between East and West: Poland’s Pioneering Bridges
ASCE | 2016
|Nicholas Grimshaw & Partners' regional headquarters for telecom company Orange, in Darlington
British Library Online Contents | 1998