Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Minimizing Service Interruptions Due to Transmission Line Failures
Minimizing Service Interruptions Due to Transmission Line Failures
Minimizing Service Interruptions Due to Transmission Line Failures
Brush, William W. (Autor:in)
Journal ‐ American Water Works Association ; 41 ; 627-634
01.07.1949
8 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Minimizing duration and crew work interruptions of repetitive construction projects
British Library Online Contents | 2018
|Risk assessment of water supply interruptions due to mechanical pipe failures
British Library Conference Proceedings | 2007
|British Library Online Contents | 1996
|Online Contents | 1996
|