A platform for research: civil engineering, architecture and urbanism
Glycol Concentration Requirements for Freeze Burst Protection (RP-493)
Glycol Concentration Requirements for Freeze Burst Protection (RP-493)
Glycol Concentration Requirements for Freeze Burst Protection (RP-493)
Craig, N. C. (author) / Jones, B. W. (author) / Fenton, D. L. (author) / ASHRAE
Annual meeting ; 1993 ; Denver; CO
1993-01-01
10 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Glycol Concentration Requirements for Freeze Burst Protection (RP-493)
British Library Online Contents | 1993
|Freeze and burst protection equipment for water apparatus
European Patent Office | 2018
|FOLDING UP-TYPE FREEZE AND BURST PROTECTION FACILITY FOR FIRE-FIGHTING PIPING OF BUILDINGS
European Patent Office | 2021
|