A platform for research: civil engineering, architecture and urbanism
Lake Merced Tunnel Lining: Two-Pass in Shaky Ground
Lake Merced Tunnel Lining: Two-Pass in Shaky Ground
Lake Merced Tunnel Lining: Two-Pass in Shaky Ground
11th Rapid excavation and tunneling conference ; 1993 ; Boston; MA
1993-01-01
18 pages
Also known as RETC 11
Conference paper
English
rapid excavation , rapid tunneling , AIME , mining engineers , ASCE , RETC
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Online Contents | 1975
|ASCE | 2016
|Online Contents | 2008
Online Contents | 2013
|