A platform for research: civil engineering, architecture and urbanism
Construction of the 'Passante Ferroviario' link in Milan, Italy, lots 3P, 5P and 6P: excavation by large earth pressure balanced shield with chemical foam injection
Construction of the 'Passante Ferroviario' link in Milan, Italy, lots 3P, 5P and 6P: excavation by large earth pressure balanced shield with chemical foam injection
Construction of the 'Passante Ferroviario' link in Milan, Italy, lots 3P, 5P and 6P: excavation by large earth pressure balanced shield with chemical foam injection
Peron, J. Y. (author) / Marcheselli, P. (author) / Institute of Mining and Metallurgy / British Tunnelling Society
7th International symposium, Tunnelling '94 ; 1994 ; London
1994-01-01
30 pages
Conference paper
English
tunnelling , IMM , BTS
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
British Library Conference Proceedings | 1995
|Milano: Passante Ferroviario, stazione Lancetti
Online Contents | 2001
Stability of excavation face in earth pressure balanced shield
British Library Conference Proceedings | 1995
|British Library Conference Proceedings | 2001
|Earth Pressure Balanced Shield Tunneling
ASCE | 2021
|