A platform for research: civil engineering, architecture and urbanism
Construction of triple face tunnel by urban NATM (Yokohama City Subway No. 3: Azamino Station Works)
Construction of triple face tunnel by urban NATM (Yokohama City Subway No. 3: Azamino Station Works)
Construction of triple face tunnel by urban NATM (Yokohama City Subway No. 3: Azamino Station Works)
Iwamura, I. (author) / Usuda, S. (author) / Mitsuo, J. (author) / Abdel Salam, M. E. / International Tunnelling Association
International congress, Tunnelling and ground conditions ; 1994 ; Cairo
Tunnelling and ground conditions ; 143-150
1994-01-01
8 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
NATM subway station in soft ground
British Library Conference Proceedings | 1992
|Selecting auxiliary construction methods for NATM tunnel excavation in urban areas
British Library Conference Proceedings | 2007
|Simulation of NATM tunnel construction with the BEM
UB Braunschweig | 2010
|Soft Ground Tunneling on the Seoul Subway Using NATM
British Library Conference Proceedings | 1988
|Simulation of NATM tunnel construction with the BEM
TIBKAT | 2010
|