A platform for research: civil engineering, architecture and urbanism
Dinorwig Power Station - Replacement of the Main Inlet Valve Trunnion Bearings with the Penstock Pressurised
Dinorwig Power Station - Replacement of the Main Inlet Valve Trunnion Bearings with the Penstock Pressurised
Dinorwig Power Station - Replacement of the Main Inlet Valve Trunnion Bearings with the Penstock Pressurised
Moss, W. O. (author) / Stockton, R. (author) / Cassidy, J. J.
International conference on hydropower, Waterpower '95 ; 1995 ; San Francisco; CA
1995-01-01
10 pages
In 3 vols; Theme title: Hydropower - balancing energy, environment and economics
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
PUMPED STORAGE: Valve trunnion bearing replacement at Dinorwig, UK
Online Contents | 1997
Dinorwig: Replacing valve trunnion bearings
Online Contents | 1996
Water management at Dinorwig pumped-storage power station
British Library Conference Proceedings | 2006
|British Library Conference Proceedings | 1995
|A Review of Sprayed Concrete Linings Adopted at Dinorwig Power Station
British Library Conference Proceedings | 1993
|