A platform for research: civil engineering, architecture and urbanism
Case Study: Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
Case Study: Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
Case Study: Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
Derrick, D. L. (author) / Espey, W. H. / Combs, P. G. / ASCE / Hydraulic Division / Irrigation Division / Drainage Division
1st International conference, Water resources engineering ; 1995 ; San Antonio; TX
1995-01-01
5 pages
In 2 vols; Held in conjunction with the International groundwater management symposium, the Watershed management symposium and Texas water'95. Theme title: "Water: a resource in crisis"
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
British Library Conference Proceedings | 1995
|Four Years Later, Harland Creek Bendway Weir/Willow Post Bank Stabilization Demonstration Project
British Library Conference Proceedings | 1998
|Evaluation of bendway weir bank stabilization techniques for stream restoration
Online Contents | 2012
|Evaluation of bendway weir bank stabilization techniques for stream restoration
Taylor & Francis Verlag | 2012
|Bendway Weir Riprap Sizing Criteria
ASCE | 2016
|