A platform for research: civil engineering, architecture and urbanism
Accuracy Analysis in Determining Welding Residual Stress by Blind-Hole Drilling Method
Accuracy Analysis in Determining Welding Residual Stress by Blind-Hole Drilling Method
Accuracy Analysis in Determining Welding Residual Stress by Blind-Hole Drilling Method
Ding, B.-Y. (author) / Cao, X.-M. (author) / Shanmugam, N. E. / Choo, Y. S.
4th Pacific structural steel conference, Vol 1; Steel structures ; 1995 ; Singapore
1995-01-01
8 pages
3; vols; Also known as 4PSSC and PSSC'95
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
EVALUATION OF NONUNIFORM RESIDUAL STRESS USING BLIND-HOLE DRILLING TECHNIQUE
British Library Online Contents | 2008
The Accuracy of Residual Stress Measurement by the Hole-drilling Method
British Library Online Contents | 1997
|Analysis of Blind-Holes Applied in the Hole-Drilling Method for Residual Stress Measurements
British Library Online Contents | 2015
|Influence of Drilling Parameters on the Accuracy of Hole-drilling Residual Stress Measurements
British Library Online Contents | 2014
|