A platform for research: civil engineering, architecture and urbanism
The use of pilot testing and EBPR modeling for alternative development and process selection of an EBPR retrofit
The use of pilot testing and EBPR modeling for alternative development and process selection of an EBPR retrofit
The use of pilot testing and EBPR modeling for alternative development and process selection of an EBPR retrofit
Murphy, S. B. (author) / Barbeau, D. S. (author) / Sprouse, G. B. (author) / Reusser, S. (author) / Water Environment Federation
Annual conference; 68th, Vol 1 Pt 1; Wastewater treatment research; Vol 1 Pt 2; Municipal wastewater treatment ; 1995 ; Miami Beach; FL
1995-01-01
12 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Calibration Requirements of EBPR Models
British Library Conference Proceedings | 2004
|Glycerol Driven EBPR Correlated with Tetrasphaera Enrichment
TIBKAT | 2022
|OPTIMIZATION OF SIDESTREAM FERMENTER IN EBPR WWTP
TIBKAT | 2021
|Design and Evaluation of EBPR System Considering dPAO
British Library Online Contents | 2002
|