A platform for research: civil engineering, architecture and urbanism
Treatment and Stabilization of Dredged Harbor Bottom Sediments, Central Artery/Tunnel Project, Boston, Massachusetts
Treatment and Stabilization of Dredged Harbor Bottom Sediments, Central Artery/Tunnel Project, Boston, Massachusetts
Treatment and Stabilization of Dredged Harbor Bottom Sediments, Central Artery/Tunnel Project, Boston, Massachusetts
Vaghar, S. (author) / Donovan, J. (author) / Dobosz, K. (author) / Clary, J. (author) / Meegoda, J. N. / American Society of Civil Engineers; Geo-Institute; Soil Properties Committee
Session, Dredging and management of dredged materials: proceedings of 3 sessions held in conjunction with Geo-Logan ; 1997 ; Logan; UT
1997-01-01
17 pages
Held at the GeoLogan'97 conference
Conference paper
English
dredging , GeoLogan , ASCE , soil properties
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
PARCEL 6 DEVELOPMENT, CENTRAL ARTERY/TUNNEL PROJECT, BOSTON, MASSACHUSETTS
British Library Conference Proceedings | 2002
|The Central Artery/Tunnel Project in Boston, Massachusetts, USA
British Library Conference Proceedings | 1994
|Boston Harbor/Third Harbor Tunnel, Mechanical Dredged - Sediment, Resuspension Analysis
British Library Conference Proceedings | 1991
|Overview of the Central Artery/Tunnel Project in Boston, Massachusetts
British Library Conference Proceedings | 1993
|British Library Conference Proceedings | 1997
|