A platform for research: civil engineering, architecture and urbanism
Seepage Cutoffs Using Overlapping Concrete Piles
Seepage Cutoffs Using Overlapping Concrete Piles
Seepage Cutoffs Using Overlapping Concrete Piles
Annual lecture series; 17th, United States Committee on Large Dams: Non-soil water barriers for embankment dams ; 1997 ; San Diego; CA
1997-01-01
18 pages
Conference paper
English
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Grouted Seepage Cutoffs in Karstic Limestone
ASCE | 2003
|Grouted Seepage Cutoffs in Karstic Limestone
British Library Conference Proceedings | 2003
|Finite-Depth Seepage below Flat Aprons with Equal End Cutoffs
British Library Online Contents | 2011
|Finite-Depth Seepage below Flat Aprons with Equal End Cutoffs
Online Contents | 2011
|Engineering Index Backfile | 1968
|